Production re-started

Post a reply


This question is a means of preventing automated form submissions by spambots.
Smilies
:D :) :( :o :shock: :? 8) :lol: :x :P :oops: :cry: :evil: :twisted: :roll: :wink: :!: :?: :idea: :arrow: :| :mrgreen:

BBCode is ON
[img] is ON
[url] is ON
Smilies are ON

Topic review
   

If you wish to attach one or more files enter the details below.

Maximum filesize per attachment: 25 MiB.

Expand view Topic review: Production re-started

Re: Production re-started

by synthwalker » Wed Oct 26, 2011 8:11 am

They put the panel directly on the steel shelf, don't they protect the paint with foam?

Re: Production re-started

by John Bowen » Tue Oct 25, 2011 2:16 pm

We went to HMT today to see the production, and I thought I’d take a picture of a rack of the light colored Solaris for those of you waiting!
White Solaris production.jpg
White Solaris production.jpg (1.61 MiB) Viewed 7901 times
(Sorry about the low light quality!)

Re: Production re-started

by valis » Tue Oct 25, 2011 2:59 am

:D

Production re-started

by John Bowen » Tue Oct 18, 2011 10:34 pm

Following the August ‘holiday’ in Germany, and some discussions as to how better to proceed with production in September, we have decided to transfer assembly from Sonic Core to HMT, the company who also builds the Access Virus TI, Arturia Origin, and Spektralis Accelerator.

Pictured here is their first production of units from last week:
Attachments
HMT 1st production.JPG
HMT 1st production.JPG (118.54 KiB) Viewed 7992 times

Top